Allied Telesis AT-X510DP-52GTX manual 105

Models: AT-X510DP-52GTX

1 129
Download 129 pages 55.29 Kb
Page 105
Image 105

x510DP-52GTX Installation Guide

2.Wait two or three minutes for the switches to select a master switch and to assign the ID numbers.

At this point, the stack is operational. The ID numbers are automatically stored in special files in the flash memories of the switches and are retained by the devices even if you reset or power cycle the stack.

3.To continue with the installation, go to “Verifying the Stack” on page 106.

105

Page 105
Image 105
Allied Telesis AT-X510DP-52GTX manual 105