Contents |
|
Unpacking the Switch | 55 |
Chapter 4: Installing the Switch and its Power Supplies | 57 |
Installing the Power Cord Retaining Clip | 58 |
Installing Power Supply Modules | 59 |
Overview | 59 |
Installing a Power Supply | 59 |
Installing the Switches on a Table or Desktop | 63 |
Installing the Switch in an Equipment Rack | 64 |
Connecting AC Power to a Power Supply Module | 67 |
Power Wiring to a DC | 69 |
Starting a Local Management Session | 73 |
Monitoring the Initialization Processes | 74 |
Chapter 5: Configuring the Switch for | 77 |
Configuring the Switch for | 78 |
Disabling VCStack | 78 |
Confirming the Status of the VCStack Feature | 81 |
Specifying Ports in the Command Line Interface for | 83 |
Chapter 6: Verifying the Status of VCStack and Activating VCStack | 85 |
Verifying the Status of VCStack | 86 |
Activating the VCStack Feature | 87 |
Activating VCStack | 87 |
Chapter 7: Cabling the Stacking Ports | 91 |
Cabling Switches with | 92 |
Cabling Switches with | 97 |
Chapter 8: Powering On the Stack | 101 |
Powering On the Switches Individually | 102 |
Powering On the Switches Simultaneously | 104 |
Verifying the Stack | 106 |
Setting the Priority Numbers | 107 |
Chapter 9: Cabling the Networking Ports | 109 |
Cabling the Twisted Pair Ports | 110 |
Installing SFP and SFP+ Transceivers | 112 |
Chapter 10: Troubleshooting | 117 |
Appendix A: Technical Specifications | 123 |
Physical Specifications | 123 |
Environmental Specifications | 123 |
Power Specifications | 124 |
Certifications | 124 |
125 | |
127 | |
Fiber Optic Specifications of the | 128 |
6