Contents

 

Unpacking the Switch

55

Chapter 4: Installing the Switch and its Power Supplies

57

Installing the Power Cord Retaining Clip

58

Installing Power Supply Modules

59

Overview

59

Installing a Power Supply

59

Installing the Switches on a Table or Desktop

63

Installing the Switch in an Equipment Rack

64

Connecting AC Power to a Power Supply Module

67

Power Wiring to a DC AT-PWR250R-80 Power Supply Module

69

Starting a Local Management Session

73

Monitoring the Initialization Processes

74

Chapter 5: Configuring the Switch for Stand-alone Operations

77

Configuring the Switch for Stand-alone Operations

78

Disabling VCStack

78

Confirming the Status of the VCStack Feature

81

Specifying Ports in the Command Line Interface for Stand-alone Switches

83

Chapter 6: Verifying the Status of VCStack and Activating VCStack

85

Verifying the Status of VCStack

86

Activating the VCStack Feature

87

Activating VCStack

87

Chapter 7: Cabling the Stacking Ports

91

Cabling Switches with AT-StackXS/1.0 Transceivers

92

Cabling Switches with AT-StackOP/0.3 or AT-StackOP/9.0 Transceivers

97

Chapter 8: Powering On the Stack

101

Powering On the Switches Individually

102

Powering On the Switches Simultaneously

104

Verifying the Stack

106

Setting the Priority Numbers

107

Chapter 9: Cabling the Networking Ports

109

Cabling the Twisted Pair Ports

110

Installing SFP and SFP+ Transceivers

112

Chapter 10: Troubleshooting

117

Appendix A: Technical Specifications

123

Physical Specifications

123

Environmental Specifications

123

Power Specifications

124

Certifications

124

RJ-45 Twisted Pair Port Pinouts

125

RJ-45 Style Serial Console Port Pinouts

127

Fiber Optic Specifications of the AT-StackOP/0.3 and AT-StackOP/9.0 Transceivers

128

6

Page 6
Image 6
Allied Telesis AT-X510DP-52GTX manual Powering On the Switches Individually