x510DP-52GTX Installation Guide

5.Remove the dust cover from the S2 slot in the next switch in the stack as shown in Figure 58 on page 95.

Note

The cable must crossover to different slots on the switches. The stack will not work if you connect two S1 or S2 slots together.

25

 

 

 

 

 

 

SFP+

S1

/2

 

 

 

 

 

7

 

 

 

 

 

 

 

2

6

 

 

 

CON

 

 

 

 

 

 

 

 

 

S2/2

 

SO

LE

 

 

8

 

2684

Figure 58. Removing the Dust Plug from the S2 Slot

6. Remove the dust cover from the connector on the other end of the transceiver.

95

Page 95
Image 95
Allied Telesis AT-X510DP-52GTX manual Sfp+ Con