x510DP-52GTX Installation Guide

To install an SFP or SFP+ transceiver, perform the following procedure:

1.Remove the dust plug from a transceiver slot on the switch.

Figure 69 on page 113 shows the dust plug being removed from a port.

25

 

 

 

 

SF

 

 

 

 

P+

 

 

 

 

/2

7

 

 

2

6

 

CON

 

 

 

 

 

 

S2/2

 

SO

LE

 

8

 

2675

Figure 69. Removing the Dust Plug from an SFP+ Slot

Note

When VCStack is enabled on the switch, slots S1/51 and S2/52 are reserved as stacking ports and may not be used for regular SFP or SFP+ transceivers.

2.Remove the transceiver from its shipping container and store the packaging material in a safe location.

3.If you are installing the transceiver in a top slot, position the transceiver with the Allied Telesis label facing up. If you are installing the transceiver in a bottom slot, position the transceiver with the label

facing down.

113

Page 113
Image 113
Allied Telesis AT-X510DP-52GTX manual On page 113 shows the dust plug being removed from a port