x510DP-52GTX Installation Guide

4.Remove the dust cover from the transceiver, as shown in Figure 62 on page 99.

25

 

 

 

 

 

SFP+

S1

/2

 

 

 

 

7

 

 

 

 

 

 

 

 

 

 

 

26

 

 

 

 

 

 

S2/2

 

SO

LE

 

8

 

2689

Figure 62. Removing the Dust Cover from a Stacking Transceiver

5.Verify the position of the handle on the transceiver. If the transceiver is in the S1 slot, the handle should be in the upright position, as shown in Figure 63. If the transceiver is in the S2 slot, the handle should be in

the down position.

25

SFP+

S1

/27

 

 

 

26

S2/2

8

SOLE

2690

SFP Handle

Figure 63. Positioning the Handle in the Upright Position

99

Page 99
Image 99
Allied Telesis AT-X510DP-52GTX manual Positioning the Handle in the Upright Position