Allied Telesis AT-X510DP-52GTX manual 2678

Models: AT-X510DP-52GTX

1 129
Download 129 pages 55.29 Kb
Page 115
Image 115

x510DP-52GTX Installation Guide

6.Verify the position of the handle on the SFP transceiver. If the transceiver is in a top slot, the handle should be in the upright position, as shown in Figure 72 on page 115. If the transceiver is in a bottom slot, the handle should be in the down position.

SFP+

/2

7

26

 

 

 

 

 

 

 

 

 

 

 

 

S2/2

 

SO

LE

 

 

8

 

 

 

 

 

 

 

SFP Handle

2678

 

Figure 72. Positioning the SFP or SFP+ Handle in the Upright Position

7.Connect the fiber optic cable to the transceiver, as shown in Figure 73. The connector on the cable should fit snugly into the port, and the tab should lock the connector into place.

SFP+

/2

7

26

 

CON

 

 

 

 

S2/2

 

SO

LE

8

 

2679

Figure 73. Connecting a Fiber Optic Cable to an SFP or SFP+ Transceiver

8. Repeat this procedure to install additional transceivers.

115

Page 115
Image 115
Allied Telesis AT-X510DP-52GTX manual 2678