Chapter 7: Cabling the Stacking Ports

7.Position the transceiver with the release tab on the bottom and slide it into the slot until it clicks into place, as shown in Figure 59 on page 96.

25

 

 

 

 

 

SFP+

S1

/2

 

 

 

 

7

 

 

 

 

 

 

26

 

 

 

CON

 

 

 

 

 

 

 

S2

/2

 

SO

LE

 

8

 

 

 

 

 

2685

Figure 59. Installing the AT-StackXS/1.0 Transceiver in Slot S2

8.Repeat this procedure to connect additional switches to the stack with AT-StackXS/1.0 transceivers.

9.To create the redundant path with the ring topology shown in Figure 15 on page 42 and Figure 16 on page 43, connect a stacking cable to the empty stacking slots on the top and bottom switches.

10.After connecting the stacking cables to all the switches, go to Chapter 8, “Powering On the Stack” on page 101.

96

Page 96
Image 96
Allied Telesis AT-X510DP-52GTX manual 2685