Chapter 4: Installing the Switch and its Power Supplies
Installing the Switch in an Equipment Rack
This procedure requires the following items:
Twelve bracket screws (included with the switch)
Two equipment rack brackets (included with the switch)
Four standard equipment rack screws (not provided)
Installation guidelines may be found in “Choosing a Site for the Switches” on page 52. Here is the procedure for installing the switch horizontally or vertically in a
Caution
The chassis may be heavy and awkward to lift. Allied Telesis recommends that you get assistance when mounting the chassis in an equipment rack. E28
1. Place the unit upside down on a level, secure surface.
CONSOLE
|
|
|
|
|
|
|
|
|
|
|
| COL | HDX | FDX | ACT | LINK 10/100 | ACT | LINK 1000 |
|
|
|
|
|
|
|
|
S2/52 |
| 50 | 48 | 46 | 44 | 42 | 40 | 38 | 36 | 34 | 32 | 30 | 28 | 26 | 24 | 22 | 20 | 18 | 16 | 14 | 12 | 10 | 8 | 6 | 4 | 2 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
S1/51 | SFP+ | 49 | 47 | 45 | 43 | 41 | 39 | 37 | 35 | 33 | 31 | 29 | 27 | 25 | 23 | 21 | 19 | 17 | 15 | 13 | 11 | 9 | 7 | 5 | 3 | 1 |
Figure 25. Turning the Switch Upside Down
2668
2.Using a
21 01 8 6 4 2
11 9 75 3 1
2669
Figure 26. Removing the Rubber Feet
64