Chapter 4: Installing the Switch and its Power Supplies

Assigning Active Workload to HA processes: hsl, nsm, rmond, sflowd, vrrpd, irdpd, lacpd

lldpd, loopprotd, mstpd, authd, epsrd, imi, imiproxyd

Received event network.activated

Loading default configuration

Warning: flash:/default.cfg does not exist, loading factory defaults.

..

done!

Received event network.configured

awplus login:

Figure 38. Switch Initialization Messages (Continued)

76

Page 76
Image 76
Allied Telesis AT-X510DP-52GTX manual Switch Initialization Messages