x510 Series Installation Guide for Virtual Chassis Stacking

Unpacking the Switch

Figure 18 lists the items that come with the switch. If any item is missing or damaged, contact your Allied Telesis sales representative for assistance.

One 2 m (6.6 ft) local management cable with RJ-45 (8P8C) and DB-9 (D-sub 9-pin) connectors.

Two rack mounting brackets

1947

One AT-PLN250 blank panel for covering an empty power supply bay

Twelve rack mounting bracket screws

2047

Figure 18. Components of the switch

Note

You should retain the original packaging material in the event you need to return the unit to Allied Telesis.

After checking the contents of the shipping containers, go to Chapter 4, “Installing the Switch and its Power Supplies” on page 57

55

Page 55
Image 55
Allied Telesis AT-X510DP-52GTX manual Unpacking the Switch