Allied Telesis AT-X510DP-52GTX manual Monitoring the Initialization Processes

Models: AT-X510DP-52GTX

1 129
Download 129 pages 55.29 Kb
Page 74
Image 74

Chapter 4: Installing the Switch and its Power Supplies

Monitoring the Initialization Processes

It takes about thirty seconds for the switch to initialize its management software programs and features, and load the default configuration. You may monitor the progress of the initialization process by watching the switch ID LED. It displays the number “8” for about the first 15 seconds and then displays the number “1.”

You may also monitor the bootup sequence by connecting a terminal or computer that has a terminal emulator program, to the Console port on the master switch. You will see the messages in Figure 36 here to Figure 38 on page 76.

Bootloader 2.0.15 loaded

Press <Ctrl+B> for the Boot Menu

Reading filesystem...

 

 

 

 

Loading flash:x510-5.4.3-3.7.rel...

 

 

 

Verifying release... OK

 

 

 

 

Booting...

 

 

 

 

 

Starting base/first...

 

[

OK

]

Mounting virtual filesystems...

[

OK

]

 

______________

____

 

 

 

 

/\ \

/ /______\

 

 

 

/

\ \_

__/ / ______

 

 

 

/

\

/

______

 

 

 

/

\ \

/ /

\ ____ /

 

 

 

/______/\____\ \/ /____________/

 

 

 

Allied Telesis Inc.

 

 

 

 

AlliedWare Plus (TM) v5.4.2A

 

 

 

Current release filename: x510-5.4.3-3.7.rel

 

 

 

Original release filename: x510-5.4.3-3.7.rel

 

 

 

Built: 08-Oct-2013 10:43:42 NZDT 2013 by: maker@maker04-build

 

Mounting static filesystems...

[

OK

]

Checking flash filesystem...

[

OK

]

Mounting flash filesystem...

[

OK

]

Checking NVS filesystem...

[

OK

]

Mounting NVS filesystem...

[

OK

]

Starting base/dbus...

 

[

OK

]

Starting base/syslog...

 

[

OK

]

Figure 36. Switch Initialization Messages

74

Page 74
Image 74
Allied Telesis AT-X510DP-52GTX manual Monitoring the Initialization Processes, Switch Initialization Messages