
Chapter 2 Preparing to Install the Cisco Wide Area Application Engine
Safety Guidelines
•To help protect your system components from sudden, transient increases and decreases in electrical power, use a surge suppressor, line conditioner, or uninterruptible power supply (UPS).
•Position cables and power cords carefully; route cables and the power cord and plug so that they cannot be stepped on or tripped over. Be sure that nothing rests on your system components’ cables or power cord.
•Do not modify power cables or plugs. Consult a licensed electrician or your power company for site modifications. Always follow your local or national wiring rules.
Protecting Against Electrostatic Discharge
Static electricity can harm delicate components inside the device. To prevent static damage, discharge static electricity from your body before you touch any of your system’s electronic components. You can do so by touching an unpainted metal surface on the chassis.
You can also take the following steps to prevent damage from electrostatic discharge (ESD):
•When unpacking a
•When transporting a sensitive component, first place it in an antistatic container or packaging.
•Handle all sensitive components in a
Rack Installation Safety Guidelines
Before installing your device in a rack, review the following guidelines:
•Two or more people are required to install the device in a rack.
•Ensure that the room air temperature is below 95°F (35°C).
•Do not block any air vents; usually 6 inches (15 cm) of space provides proper airflow.
| Cisco Wide Area Application Engine 511 and 611 Hardware Installation Guide |
|