Chapter 3 Installing the Cisco Wide Area Application Engine

Installing the Cisco Wide Area Application Engine

On the rear of the rail, press on the two rear tabs, and slide the pin carriage toward the front of the rail, releasing the latch tab as it catches in place. To prevent the rail-adjustment bracket (labeled 1 in Figure 3-4) from moving during this step, hold it in place with your thumb.

Note Slide rails are marked (RIGHT/FRONT and LEFT/FRONT) for proper placement.

Figure 3-4 Opening the Spring-Loaded Pin Carriages—Left Slide Rail Shown

4

3

2

1

1

Rail-adjustment bracket

2

Latch tab

 

 

 

 

3

Slider tab

4

Pin carriage

 

 

 

 

Step 2 To adjust the length of the slide rail, lift the release tab (labeled 1 in Figure 3-5) and fully extend the rail-adjustment bracket from the rear of the slide rail until it snaps into place.

Step 3 To secure the slide rail to the equipment rack, align the pins on the rear of the slide rail with the holes on the rear mounting flange. Press the latch tab (labeled 2 in Figure 3-5) to release the pin carriage.

 

Cisco Wide Area Application Engine 511 and 611 Hardware Installation Guide

3-6

OL-7220-02

Page 62
Image 62
Cisco Systems 611 manual Installing the Cisco Wide Area Application Engine