Chapter 3 Installing the Cisco Wide Area Application Engine

Installing the Cisco Wide Area Application Engine

Note Leave enough slack in the cables to allow for sliding the device in or out of the rack.

Step 9 To transport the rack to another location with the chassis installed, you must secure the chassis to the rack.

a.Remove one mounting screw and loosen the other mounting screws as indicated in Figure 3-10.

Figure 3-10 Securing the Chassis for Transporting in the Rack

Loosen

mounting

screws

Move mounting screw

134410

b.If necessary, disconnect the cables from the rear of the chassis, then slide the chassis out of the rack six inches (150 mm).

c.Fully extend the rail, and reinsert the M6 screws in each slide rail. To secure the rail, tighten all screws. The rails should be fully extended to the rear of the rack, and the shipping brackets should be installed.

d.Secure the chassis to the rack with the M6 screws.

To remove the chassis from the rack, reverse these instructions. Store these installation instructions with your product documentation for future use.

 

 

Cisco Wide Area Application Engine 511 and 611 Hardware Installation Guide

 

 

 

 

 

 

OL-7220-02

 

 

3-11

 

 

 

Page 67
Image 67
Cisco Systems 611 manual Securing the Chassis for Transporting in the Rack