Appendix D Site Planning and Maintenance Records

Site Preparation Checklist

Send documentation comments to mdsfeedback-doc@cisco.com.

Table D-1 Site Planning Checklist

Task No.

Planning Activity

Verified By

Time

Date

 

 

 

 

 

1

Space evaluation:

 

 

 

 

Space and layout

 

 

 

 

Floor covering

 

 

 

 

Impact and vibration

 

 

 

 

Lighting

 

 

 

 

Maintenance access

 

 

 

 

 

 

 

 

2

Environmental evaluation:

 

 

 

 

Ambient temperature

 

 

 

 

Humidity

 

 

 

 

Altitude

 

 

 

 

Atmospheric contamination

 

 

 

 

Air flow

 

 

 

 

 

 

 

 

3

Power evaluation:

 

 

 

 

Input power type

 

 

 

 

Power receptacles1

 

 

 

 

Receptacle proximity to the

 

 

 

 

 

equipment

 

 

 

 

Dedicated circuit for power supply

 

 

 

 

Dedicated (separate) circuits for

 

 

 

 

 

redundant power supplies

 

 

 

 

UPS2 for power failures

 

 

 

4

Grounding evaluation:

 

 

 

 

Circuit breaker size

 

 

 

 

CO ground (AC- powered systems)

 

 

 

 

 

 

 

 

 

 

Cisco MDS 9216 Switch Hardware Installation Guide

D-2

78-16165-01

Page 130
Image 130
Cisco Systems 9216 manual Task No Planning Activity Verified By Time Date