AppendixD Site Planning and Maintenance Records
Site Preparation Checklist
D-2
Cisco MDS 9216 Switch Hardware Installation Guide
78-16165-01
TableD-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
Space and layout
Floor covering
Impact and vibration
Lighting
Maintenance access
2 Environmental evaluation:
Ambient temperature
Humidity
Altitude
Atmospheric contamination
Air flow
3 Power evaluation:
Input power type
Power receptacles1
Receptacle proximity to the
equipment
Dedicated circuit for power supply
Dedicated (separate) circuits for
redundant power supplies
UPS2 for power failures
4 Grounding evaluation:
Circuit breaker size
CO ground (AC- powered systems)