
Appendix D Site Planning and Maintenance Records
Site Preparation Checklist
Send documentation comments to mdsfeedback-doc@cisco.com.
Table
Task No. | Planning Activity | Verified By | Time | Date | |
|
|
|
|
| |
1 | Space evaluation: |
|
|
| |
| • | Space and layout |
|
|
|
| • | Floor covering |
|
|
|
| • | Impact and vibration |
|
|
|
| • | Lighting |
|
|
|
| • | Maintenance access |
|
|
|
|
|
|
|
| |
2 | Environmental evaluation: |
|
|
| |
| • | Ambient temperature |
|
|
|
| • | Humidity |
|
|
|
| • | Altitude |
|
|
|
| • | Atmospheric contamination |
|
|
|
| • | Air flow |
|
|
|
|
|
|
|
| |
3 | Power evaluation: |
|
|
| |
| • | Input power type |
|
|
|
| • | Power receptacles1 |
|
|
|
| • Receptacle proximity to the |
|
|
| |
|
| equipment |
|
|
|
| • Dedicated circuit for power supply |
|
|
| |
| • Dedicated (separate) circuits for |
|
|
| |
|
| redundant power supplies |
|
|
|
| • UPS2 for power failures |
|
|
| |
4 | Grounding evaluation: |
|
|
| |
| • | Circuit breaker size |
|
|
|
| • CO ground (AC- powered systems) |
|
|
| |
|
|
|
|
|
|
| Cisco MDS 9216 Switch Hardware Installation Guide |