Send documentation comments to mdsfeedback-doc@cisco.com.
AppendixD Site Planning and Maintenance Records
Site Preparation Checklist
D-2
Cisco MDS 9216 Switch Hardware Installation Guide
78-16165-01
TableD-1 Site Planning Checklist
Task No. Planning Activity Verified By Time Date
1 Space evaluation:
•Space and layout
•Floor covering
•Impact and vibration
•Lighting
•Maintenance access
2 Environmental evaluation:
•Ambient temperature
•Humidity
•Altitude
•Atmospheric contamination
•Air flow
3 Power evaluation:
•Input power type
•Power receptacles1
•Receptacle proximity to the
equipment
•Dedicated circuit for power supply
•Dedicated (separate) circuits for
redundant power supplies
•UPS2 for power failures
4 Grounding evaluation:
•Circuit breaker size
•CO ground (AC- powered systems)