Appendix D Site Planning and Maintenance Records

 

 

 

 

 

Site Preparation Checklist

 

 

 

Send documentation comments to mdsfeedback-doc@cisco.com.

 

Table D-1 Site Planning Checklist (continued)

 

 

 

 

 

 

 

 

 

 

 

 

Task No.

Planning Activity

Verified By

Time

 

Date

 

 

 

 

 

 

 

 

5

Cable and interface equipment

 

 

 

 

 

 

evaluation:

 

 

 

 

 

 

Cable type

 

 

 

 

 

 

Connector type

 

 

 

 

 

 

Cable distance limitations

 

 

 

 

 

 

Interface equipment (transceivers)

 

 

 

 

 

 

 

 

 

 

 

 

6

EMI3 evaluation:

 

 

 

 

 

 

Distance limitations for signaling

 

 

 

 

 

 

Site wiring

 

 

 

 

 

 

RFI4 levels

 

 

 

 

 

1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.

2.UPS = uninterruptible power supply.

3.EMI = electromagnetic interference

4.RFI = radio frequency interference.

 

 

Cisco MDS 9216 Switch Hardware Installation Guide

 

 

 

 

 

 

78-16165-01

 

 

D-3

 

 

 

Page 131
Image 131
Cisco Systems 9216 manual Task No Planning Activity Verified By Time