Appendix D Site Planning and Maintenance Records
|
|
|
|
| Site Preparation Checklist |
| |
|
| Send documentation comments to |
| ||||
Table |
|
|
|
|
| ||
|
|
|
|
|
|
| |
Task No. | Planning Activity | Verified By | Time |
| Date |
| |
|
|
|
|
|
|
| |
5 | Cable and interface equipment |
|
|
|
|
| |
| evaluation: |
|
|
|
|
| |
| • | Cable type |
|
|
|
|
|
| • | Connector type |
|
|
|
|
|
| • | Cable distance limitations |
|
|
|
|
|
| • | Interface equipment (transceivers) |
|
|
|
|
|
|
|
|
|
|
|
| |
6 | EMI3 evaluation: |
|
|
|
|
| |
| • Distance limitations for signaling |
|
|
|
|
| |
| • | Site wiring |
|
|
|
|
|
| • | RFI4 levels |
|
|
|
|
|
1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2.UPS = uninterruptible power supply.
3.EMI = electromagnetic interference
4.RFI = radio frequency interference.
|
| Cisco MDS 9216 Switch Hardware Installation Guide |
|
|
|
|
| ||
|
|
| ||
|
|
|