
Appendix D Site Planning and Maintenance Records
| 
 | 
 | 
 | 
 | 
 | Site Preparation Checklist | 
 | |
| 
 | 
 | Send documentation comments to  | 
 | ||||
| Table  | 
 | 
 | 
 | 
 | 
 | ||
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| Task No. | Planning Activity | Verified By | Time | 
 | Date | 
 | |
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| 5 | Cable and interface equipment | 
 | 
 | 
 | 
 | 
 | |
| 
 | evaluation: | 
 | 
 | 
 | 
 | 
 | |
| 
 | • | Cable type | 
 | 
 | 
 | 
 | 
 | 
| 
 | • | Connector type | 
 | 
 | 
 | 
 | 
 | 
| 
 | • | Cable distance limitations | 
 | 
 | 
 | 
 | 
 | 
| 
 | • | Interface equipment (transceivers) | 
 | 
 | 
 | 
 | 
 | 
| 
 | 
 | 
 | 
 | 
 | 
 | 
 | |
| 6 | EMI3 evaluation: | 
 | 
 | 
 | 
 | 
 | |
| 
 | • Distance limitations for signaling | 
 | 
 | 
 | 
 | 
 | |
| 
 | • | Site wiring | 
 | 
 | 
 | 
 | 
 | 
| 
 | • | RFI4 levels | 
 | 
 | 
 | 
 | 
 | 
1.Verify that the power supply installed in the chassis has a dedicated AC source circuit.
2.UPS = uninterruptible power supply.
3.EMI = electromagnetic interference
4.RFI = radio frequency interference.
| 
 | 
 | Cisco MDS 9216 Switch Hardware Installation Guide | 
 | 
 | 
| 
 | 
 | 
 | ||
| 
 | 
 | 
 | ||
| 
 | 
 | 
 | 
