Contents

 

 

Send documentation comments to mdsfeedback-doc@cisco.com.

 

 

 

 

Starting Up the Switch 2-17

 

 

 

 

 

 

 

 

Connecting the Power Supplies

2-18

 

 

 

 

 

Powering Up the Switch and Verifying Component Installation 2-19

 

 

Removing and Installing Components 2-21

 

 

 

 

 

Removing and Installing Switching and Services Modules

2-22

 

 

 

Removing a Switching or Services Module from Slot 2

2-25

 

 

 

Installing a Switching or Services Module in Slot 2 2-25

 

 

Verifying Installation of a Switching or Services Module in Slot 2 2-27

 

 

Removing and Installing Power Supplies

2-27

 

 

 

 

Removing a Power Supply

2-28

 

 

 

 

 

Installing a Power Supply

 

2-29

 

 

 

 

 

Removing and Installing the Fan Module

2-31

 

 

 

 

Removing a Fan Module

2-32

 

 

 

 

 

Installing a Fan Module

2-32

 

 

 

 

 

Connecting the Cisco MDS 9216 Switch 3-1

 

 

 

C H A P T E R 3

 

 

 

 

 

 

Preparing for Network Connections

3-2

 

 

 

 

 

Connecting to the Console Port

3-2

 

 

 

 

 

 

Connecting to the COM1 Port

3-4

 

 

 

 

 

 

 

Connecting to the MGMT 10/100 Ethernet Port 3-6

 

 

 

 

 

Connecting to a Fibre Channel Port 3-7

 

 

 

 

 

Installing an SFP Transceiver and Fiber Optic Cable

3-9

 

 

 

 

Removing an SFP Transceiver and Fiber Optic Cable

3-10

 

 

 

 

Maintaining SFP Transceivers and Fiber Optic Cables 3-10

 

Troubleshooting

 

 

 

 

A P P E N D I X A

A-1

 

 

 

 

 

Getting Started

A-1

 

 

 

 

 

Solving Problems at the Component Level A-2

 

 

 

 

 

Identifying Startup Problems A-3

 

 

 

 

 

 

Cisco MDS 9216 Switch Hardware Installation Guide

 

 

 

 

 

 

 

78-16165-01

 

 

 

 

vii

 

 

 

 

 

Page 7
Image 7
Cisco Systems 9216 manual Removing and Installing Components, Vii