Chapter 5 Configuration Menu
> 5.3 Thin Provisioning Management
ETERNUS DX400/DX8000 series ETERNUSmgr User Guide Settings/Maintenance
291 Copyright 2010 FUJITSU LIMITED
P2X0-0760-02ENZ0
This section explains how to display the progress of a balancing Thin Provisioning Volume.
The following operations/settings are available on this screen.
Checking the Progress of the Balancing TPV
Check the status and progress of the balancing TPV.
Stopping a Balancing TPV
Stop the selected balancing TPV and delete the work volume.
In order to recover normal status (the status before failure), the
configuration information of the ETERNUS DX400/DX8000 series may
be needed. After balancing of all the TPVs has been completed (*1),
use the [Export Configuration] function to get the configuration
information.
When Resource Domains are registered in the ETERNUS DX400/
DX8000 series, the displayed progress status of a balancing TPV differs
depending on the current user account.
-When logged on using a Total Administrator account, progress status
for all the balancing TPVs that are assigned to Resource Domains
are displayed.
-When logged on using a Resource Domain Administrator account,
only the progress status of balancing TPVs that are assigned to the
relevant Resource Domain, and only the progress status of
balancing TPVs that are assigned to the Shared Resource, are
displayed.
*1: This indicates that normal balancing of TPVs has been completed, and
balancing TPV sessions that terminated due to error are deleted completely.
Use the [Balance Thin Provisioning Volume] function to balance TPVs.
Up to 32 balancing TPVs including RAID Migration can be performed at
the same time. Refer to the [Progress of RAID Migration] menu for
progress status of RAID Migration.
When the balancing of a TPV is stopped, the physical alloca ted state of
the TPV is not changed from it was before balancing was performed.