14 Push the two levers (green) towards each other to disengage with the lower locking holes and lift them up until they engage with the two upper locking holes.
15 Connect the two relay connectors on the roller ASY.
16 Close the upper transport
unit. (See page
Pad Replacement Replace the pad as follows:
WARNING
Wait at least 3 minutes after turning off the power before replacement.
Upper transport unit
Operator panel
Power switch
Lever
Lever (green)
Roller ASY
1Turn off the power switch. Make sure that the hopper table is at the bottom.
2Open the upper transport unit. (See page
3Disconnect the two relay connectors on the roller ASY.
4Push the two levers (green) towards each other to disengage with the upper locking holes and lower down the two levers until they engage with the two levers locking holes.
M3099EX/EH OEM Manual |