CONNECW
6.Press cycle selection switch after temperature is displayed on front of control panel.
To shutdown burner:
1.Rotate manual valve knob of Combination Control to the “OFF” position.
2.Turn Power/Pump Switch to the “OFF” position.
This fryer is equipped with a grounded cord and plug for your protection against shock, and should be plugged into a 3 prong grounded receptacle. Do not cut or remove grounding prong.
Before servicing the fryer, the burner should be shut down and the electrical supply removed from the unit. The fryer should be unplugged or the wall circuit breaker turned off, or electrical shock could result.
1.Place breaded chicken on greased racks with the largest pieces towards the outside of the rack.
2.Load racks into basket starting at the bottom of basket and working up with each rack.
3.Place a clean, empty rack into the slot above the top rack of chicken to prevent pieces from floating while cooking.
For additional information on racking chicken, refer to KFC’s COM.