Chapter 9

Connecting the Router and PerformingInitial Configuration
After installing the routerinto the rack as described in “Installing the Router Using a
Mechanical Lift” on page 81or “Installing the Router without a Mechanical Lift” on
page 83, complete the installationby connecting management and alarm devices,
PICs, and power cables. This chapter has the following sections:
Tools and PartsRequired on page 111
Connecting the Routerto Management and Alarm Devices on page 112
Connecting PIC Cables on page 115
Providing Powerto the Routeron page117
Configuring the JUNOS Internet Softwareon page 121
Tools and Parts Required
To connect the routerto management devices and PICs and to power on
the router,you need the following tools and parts:
Phillips (+) screwdrivers, numbers 1 and 2
2.5 mm flat-blade (-) screwdriver
7/16-in. hexagonal-he ad external drive socket wrench, or nut driver, with a
minimum of 30 lb-in. (3.5 Nm) tightening torque, for tightening nuts to
terminal studs on the circuit breakerbox
Toolsand Parts Required 111