Pre-Loaded Installation
If your system was
This section describes the procedure to complete the
Starting the Pre-Loaded Installation
To start the
1.Carefully read the warning on the previous page.
2.Verify that both the mouse and the keyboard are plugged into the appropriate receptacles in the back of the system.
3.Verify your system is connected to the network onto which it will be installed. Before continuing, verify you have the following information:
–The name of your domain
–The unique name of this system
–Whether this system will be the Primary Domain Controller (PDC) or a Backup Domain Controller (BDC)
4.Remove the yellow CAUTION label from the front of the system, and open the disk drive access door.
5.Power on the system by pressing the power button on the front panel or inside the disk drive access door. The system begins its POST tests and prepares for completion of the Windows NT installation.
Entering the Setup Routine for NCR Server Manager
To enter the setup routine for NCR Server Manager, follow these steps:
1.After the POST tests have completed, and several Windows NT screens have briefly displayed, enter the setup routine for NCR Server Manager.
NCR S16 Minitower Server Installing Network Operating System |