Initial Startup and Configuration

Switchpack Definitions

Manually change configuration options by moving Switchpack S1 DIP switches on the card. Table 3-1 lists Switchpack S1 definitions.

Table 3-1. Switchpack S1 Definitions

Switch # . . .

Allows you to . . .

Default in Bold

 

 

 

1

Enables or disables Switchpacks S1 and S2.

 

 

OFF = Switchpacks Disabled

 

 

ON = Switchpacks Enabled

 

 

 

 

2

3

Controls line termination.

OFF = 120 Ohm

ON = 75 Ohm

Selects the unit's primary timing source. Only valid for units configured as LTU.

OFF = Internal Clock

ON = External Clock

4

Controls the unit's E1 line coding.

 

OFF = HDB3

 

ON = AMI

 

 

5

Not used

 

 

6

Enables CRC-4 monitoring.

 

OFF = Enable CRC-4

 

ON = Disable CRC-4 monitoring

 

 

7

Controls whether Channel 16 contains signaling information or data.

 

OFF = Channel 16 is used for signaling

 

ON = Channel 16 is used for data

 

 

8

Not used

 

 

3-8

September 1998

7986-A2-GB20-00

Page 34
Image 34
Paradyne HOTWIRE 7986 manual Switchpack Definitions, Switchpack S1 Definitions Switch # Allows you to