Configuration Option Tables

System Options Menu

For System Options, refer to Table A-3. To access the System Options screen, follow this menu selection sequence:

Main Menu Configuration Load Configuration From

main/config/system

 

Hotwire

 

 

Model: 7986

SYSTEM OPTIONS

 

 

DSL Mode:

NTU

 

Test Timeout:

Enable

Test Duration (min):

10

 

G.703 Line Termination

120

Ohm

±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±±È±±±±±±±±±±±±±±±±±±±±±±±±±±±±±

Ctrl-a to access these functions, ESC for previous menu

MainMenu Exit

Save

 

Table A-3. System Options

DSL Mode

Possible Settings: LTU, NTU

Default Setting: NTU

Controls whether the unit is configured as a control unit or tributary unit.

LTU ± The unit is configured as a control unit (Line Termination Unit).

NTU ± The unit is configured as a tributary unit (Network Termination Unit). This unit will request its IP address from the LTU during establishment of the PPP link.

NOTE: Changing this option will reset the card.

Test Timeout

Possible Settings: Enable, Disable

Default Setting: Enable

Allows user-initiated tests to end automatically. The feature should be enabled when the unit is remotely managed, so that control can be regained after a test is accidentally executed.

Enable ± User-initiated loopback and pattern tests end when test duration is reached.

Disable ± Tests can be terminated manually from the Network Tests screen. Refer to

Running Network Tests in Chapter 5, Testing.

NOTE: Tests commanded by the DTE or network-initiated tests are not affected by this test timeout.

A-6

September 1998

7986-A2-GB20-00

Page 88
Image 88
Paradyne HOTWIRE 7986 System Options Menu, Main Menu → Configuration → Load Configuration From →, DSL Mode, Test Timeout