3.8. Initial Calibration

M102E/M501 TRS

GETTING STARTED

(Addendum to M101E Manual - P/N 04740 Rev A)

3.8. Initial Calibration

Initial calibration of the M102E should be performed with:

Zero air supplied by a zero air generator such as the Teledyne Instruments’ M701;

Calibrated H2S span gas of the appropriate concentration:

With external pneumatic connections as described in Figures 3-7 through 3-11 of this addendum, and;

Using the information and procedure included in Section 3.3 of the M101E Manual - P/N 04740 Rev A.

No initial calibration of the M501-TRS temperature controller is required.

NOTE

Once you have completed the above set-up procedures, please fill out the quality questionnaire that was shipped with your unit and return it to Teledyne Instruments. This information is vital to our efforts in continuously improving our service and our products. Thank you.

User Notes:

05514 Rev A1

19

Page 25
Image 25
Teledyne manual Initial Calibration, User Notes, M102E/M501 TRS, Getting Started, Rev A1