4.9 Switch membrane board 4 Replacement Procedures
Satellite A50S/TECRA A3X Maintenance Manual (960-534) [CONFIDENTIAL] 4-31
Installing the Switch membrane board
The following describes the procedure for installing the switch membrane board (See Figure
4-20).
1. Place the switch membrane board to the left side of the installation position and
slide it to the right to install. Then fix it with the following screw.
M2.5x2.8B THIN BIND screw x1
2. Connect the switch membrane board cable to the connector CN3280 on the system
board.