3 Tests and Diagnostics

3.16 Expansion Test

Subtest 02 RGB monitor ID

NOTE: To execute this subtest, RGB monitor ID wraparound connector is required. The wiring diagram of the connector is described in Appendix F.

Connect a wraparound connector to CRT monitor for the test of ID acquisition. This subtest is executed by using VESA command.

Satellite A50S/TECRA A3X Maintenance Manual (960-534)

[CONFIDENTIAL]

3-33

Page 143
Image 143
Toshiba A3X manual Tests and Diagnostics Expansion Test