Fuji Labs ZSP instruction manual Auto calibration

Page 26

8.7Auto calibration

In this analyzer, the signals form the input/output terminals on the upper can be used for driving an external solenoid valve and introducing standard gas, whereby zero point and span can be calibrated automatically. The auto calibration is done according to 8.7.1 Current time setting, 8.7.2 Auto calibration start time setting, 8.7.3 Auto calibration cycle setting, 8.7.4 Auto calibration ON/OFF setting and 8.7.5 Output Hold setting at Calibration.

Cautions on operation

1.When the auto calibration start time is reached during key operation, the auto calibration is given priority and is started. All key operation will be invalid until the auto calibration is finished.

2.To forcibly interrupt the auto calibration in progress, press both the ENT and CAL keys simulta- neously. After the forcible interrupt, the measuring mode is resumed and all the keys are operable. Although the current auto calibration will be passed over, it will be started from the initially set cycle from the next time onward.

Example: When auto calibration is set for 3 hour intervals starting from 8:00 a.m.

: Under auto calibration

8 : 00

11 : 00

14 : 00

17 : 00

8 : 00

11 : 00

14 : 00

17 : 00

 

 

Forcible interruption

 

3.Key operation is possible while calibration is not under way with the auto calibration function set. Therefore all settings (of span, hold, remote range, time, etc.) including manual calibration can be made. But note that if the wrong time is set on the clock, the auto calibration will not be started at the correct time.

4.Auto calibration is able to start by applying remote start input signal, 5V DC longer than 100msec, to remote start input terminals. In this case, auto calibration will start independent to its ON/OFF setting. (Calibration starts at the trailing edged of signal.)

5.When measuring 4 components, or NOx, SO2, CO and O2 (with 2 infrared gas analyzers), the auto- matic calibration cycle should be set on the CO/O2 analyzer side and the automatic calibration of NOx/SO2 analyzer should be turned OFF. After the automatic calibration of CO/O2 analyzer, the automatic calibration of NOx/SO2 analyzer will be started.

– 18 –

Image 26
Contents Infrared GAS Analyzer Introduction RequestProhibition Iii Prohibition Others Contents Vii Composition SpecificationsOutline PreparedSelection of gas sampling location InstallationSelection of installation site Installation work Connection of cablesPiping procedure Description of Each Part Injection of clean waterSupply of external power Preparation for OperationWarm-up time Setting of temperature inside lockerAirtightness test INDICATION/OPERATION Panel SO2Function and indication of indication/operation panel This panel consists of the following functionsAdvice on Operation General operation of indication/operation panelPreparation of standard gas CalibrationKinds of standard gas Pressure regulation for standard gas cylinder Calibration concentration setting except zirconia O2 sensor Func CAL SET ENTCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operating procedure OperationMaintenance Routine maintenance and inspectionConditioner Centration is measured in the setting range of 0 to Periodic maintenance and inspectionOther maintenance and inspection 200ppm or more at 0.5L/minMaintenance of sampling device Gas extractor type ZBAK1Membrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Maintenance of zirconia O2 sensor Others, major component figuresStandard Accessories and Spares Standard accessoriesSpares for 1 year optional Code for preparation of 1-year spares and suppliesProcessing of Heating Pipe Ends OutlineEnd processing method Grid 300mm 40mm Grid area 150 mm Check after piping Clamp supportSpecifications of tube trace Specifications of heating pipeTroubleshooting Troubleshooting of instrumentError codes and remedies Power consumption Ambient temperaturePower supply Mass weightNumber of output points and kinds of outputs Standard requirements For sample gasMonth/NO2, 100ppm Block diagram Moving average outputCalibration tolerance Automatic calibration output hold Automatic calibrationOrdering information Calibration cycle Once/day variable, up to 7 daysCode Symbols Diaglam Functions of individual components For outdoor installation type For indoor installation typeConnection Diagram Only specified outputs are wiredHead Office Instrumentation Div International Sales Dept