Fuji Labs ZSP instruction manual End processing method

Page 47

12.2 End processing method

(1)Power supply side (power connection kit)

q When cutting out the heating pipe, take care not to damage the heater wire.

w Pulling out on the inside of grid section provides a non-heating area of about 300 mm at maximum.

Grid

Non-heating area of 300mm long

Fig. 12-4

ePeel the outer sheath covering of heater as shown below and cut off the heater wire as close to its root as possible.

(HTP type heater has fiber glass, heater wire and thin Teflon covering under its outer sheath covering. So the outer sheath covering should be peeled neatly.)

115 mm

Cut off at root.

Fig. 12-5

rApply RTV (silicone sealant) to the terminal boots and plug the boots into the heater. Then wind a sealing tape across the boots and heater.

RTV

RTV

Terminal boots

10

Fig. 12-6

tFor connection with the power supply wire, use a press-fitting sleeve. If the press-fitting section is loose, contact resistance becomes large to cause abnormal heating of the sleeve.

Fig. 12-7

– 39 –

Image 47
Contents Infrared GAS Analyzer Request IntroductionProhibition Iii Prohibition Others Contents Vii Prepared SpecificationsOutline CompositionSelection of gas sampling location InstallationSelection of installation site Connection of cables Installation workPiping procedure Preparation for Operation Injection of clean waterSupply of external power Description of Each PartWarm-up time Setting of temperature inside lockerAirtightness test SO2 INDICATION/OPERATION PanelThis panel consists of the following functions Function and indication of indication/operation panelGeneral operation of indication/operation panel Advice on OperationPreparation of standard gas CalibrationKinds of standard gas Pressure regulation for standard gas cylinder Func CAL SET ENT Calibration concentration setting except zirconia O2 sensorCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operation Operating procedureRoutine maintenance and inspection MaintenanceConditioner 200ppm or more at 0.5L/min Periodic maintenance and inspectionOther maintenance and inspection Centration is measured in the setting range of 0 toGas extractor type ZBAK1 Maintenance of sampling deviceMembrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Others, major component figures Maintenance of zirconia O2 sensorStandard accessories Standard Accessories and SparesCode for preparation of 1-year spares and supplies Spares for 1 year optionalOutline Processing of Heating Pipe EndsEnd processing method Grid 300mm 40mm Grid area 150 mm Clamp support Check after pipingSpecifications of heating pipe Specifications of tube traceTroubleshooting of instrument TroubleshootingError codes and remedies Mass weight Ambient temperaturePower supply Power consumptionNumber of output points and kinds of outputs Standard requirements For sample gasMonth/NO2, 100ppm Moving average output Block diagramCalibration cycle Once/day variable, up to 7 days Automatic calibrationOrdering information Calibration tolerance Automatic calibration output holdCode Symbols Diaglam Functions of individual components For indoor installation type For outdoor installation typeOnly specified outputs are wired Connection DiagramHead Office Instrumentation Div International Sales Dept