12. PROCESSING OF HEATING PIPE ENDS

12.1 Outline

(1) Configuration

Power supply 100VAC, 50/60Hz

Power connection kit

About 2000

Heating pipe

Termination kit

About 500

Fig. 12-1

(2)Caution on connection of heating pipe

q The clearance between clamp supports must be about 1.2 m in the horizontal direction and about 3 m in the vertical direction.

w For a bent piping, bending should be moderate enough to ensure a minimum bending radius of 300 mm or more.

Clamp support

No good

Good

Fig. 12-2

(3)Connection diagram

A heater wire is wound around 2 isolated buses and it is brought into contact with the buses alternately at intervals of 300 mm (heating unit).

Power supply

Heating wire

300mm

300mm

300mm

300mm

300mm

300mm

 

 

Fig. 12-3

 

 

 

– 38 –

Image 46
Contents Infrared GAS Analyzer Introduction RequestProhibition Iii Prohibition Others Contents Vii Composition SpecificationsOutline PreparedSelection of installation site InstallationSelection of gas sampling location Installation work Connection of cablesPiping procedure Description of Each Part Injection of clean waterSupply of external power Preparation for OperationAirtightness test Setting of temperature inside lockerWarm-up time INDICATION/OPERATION Panel SO2Function and indication of indication/operation panel This panel consists of the following functionsAdvice on Operation General operation of indication/operation panelKinds of standard gas CalibrationPreparation of standard gas Pressure regulation for standard gas cylinder Calibration concentration setting except zirconia O2 sensor Func CAL SET ENTCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operating procedure OperationMaintenance Routine maintenance and inspectionConditioner Centration is measured in the setting range of 0 to Periodic maintenance and inspectionOther maintenance and inspection 200ppm or more at 0.5L/minMaintenance of sampling device Gas extractor type ZBAK1Membrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Maintenance of zirconia O2 sensor Others, major component figuresStandard Accessories and Spares Standard accessoriesSpares for 1 year optional Code for preparation of 1-year spares and suppliesProcessing of Heating Pipe Ends OutlineEnd processing method Grid 300mm 40mm Grid area 150 mm Check after piping Clamp supportSpecifications of tube trace Specifications of heating pipeTroubleshooting Troubleshooting of instrumentError codes and remedies Power consumption Ambient temperaturePower supply Mass weightMonth/NO2, 100ppm Standard requirements For sample gasNumber of output points and kinds of outputs Block diagram Moving average outputCalibration tolerance Automatic calibration output hold Automatic calibrationOrdering information Calibration cycle Once/day variable, up to 7 daysCode Symbols Diaglam Functions of individual components For outdoor installation type For indoor installation typeConnection Diagram Only specified outputs are wiredHead Office Instrumentation Div International Sales Dept