Fuji Labs ZSP instruction manual Pressure regulation for standard gas cylinder

Page 19

Adapter

Pressure gauge on

Pressure gauge on high pressure side

low pressure side

Pressure controls

Packing

Cylinder mounting nut

Pressure regulator

Cylinder R1/4 joint

Output handle

Fig. 8-1 Pressure regulation for standard gas cylinder

– 11 –

Image 19
Contents Infrared GAS Analyzer Request IntroductionProhibition Iii Prohibition Others Contents Vii Prepared SpecificationsOutline CompositionSelection of installation site InstallationSelection of gas sampling location Connection of cables Installation workPiping procedure Preparation for Operation Injection of clean waterSupply of external power Description of Each PartAirtightness test Setting of temperature inside lockerWarm-up time SO2 INDICATION/OPERATION PanelThis panel consists of the following functions Function and indication of indication/operation panelGeneral operation of indication/operation panel Advice on OperationKinds of standard gas CalibrationPreparation of standard gas Pressure regulation for standard gas cylinder Func CAL SET ENT Calibration concentration setting except zirconia O2 sensorCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operation Operating procedureRoutine maintenance and inspection MaintenanceConditioner 200ppm or more at 0.5L/min Periodic maintenance and inspectionOther maintenance and inspection Centration is measured in the setting range of 0 toGas extractor type ZBAK1 Maintenance of sampling deviceMembrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Others, major component figures Maintenance of zirconia O2 sensorStandard accessories Standard Accessories and SparesCode for preparation of 1-year spares and supplies Spares for 1 year optionalOutline Processing of Heating Pipe EndsEnd processing method Grid 300mm 40mm Grid area 150 mm Clamp support Check after pipingSpecifications of heating pipe Specifications of tube traceTroubleshooting of instrument TroubleshootingError codes and remedies Mass weight Ambient temperaturePower supply Power consumptionMonth/NO2, 100ppm Standard requirements For sample gasNumber of output points and kinds of outputs Moving average output Block diagramCalibration cycle Once/day variable, up to 7 days Automatic calibrationOrdering information Calibration tolerance Automatic calibration output holdCode Symbols Diaglam Functions of individual components For indoor installation type For outdoor installation typeOnly specified outputs are wired Connection DiagramHead Office Instrumentation Div International Sales Dept