Fuji Labs ZSP instruction manual Iii

Page 4

Caution on wiring

Caution

Request an installation company or your dealer to carry out wiring. If wiring is incomplete, shock hazard or injury may be caused.

Class D grounding construction is mandatory. Otherwise, shock hazard may be caused.

< Caution for wiring company >

For preventing shock hazard, fire and injury, be sure to observe the following.

Before wiring, be sure to turn off the primary power supply. If this is neglected, you may receive an electric shock.

For grounding, use a 600 V-IV wire having a diameter of 2 mm2 or more and an adequate dielectric strength.

Connect the power supply which meets the rating of product. Connection of other power supply may cause a fire.

Select the diameter of input and output wires, which matches the rated current of gas analyzer.

Be sure to use solderless terminals for connection to the input and output terminal block.

Use the terminal block for branching the output wire.

Be sure to fix the input and output wires onto the floor, wall surface, etc. and use a protective device for wires.

Caution on use

Danger

If you notice malodor or abnormal sound, stop the instrument immediately. If this is neglected, fire may occur.

Caution

When the analyzer is to be operated after it has been left unused for a long time, the operating proce- dure is different from the normal stop/start procedure. It should be handled according to the procedure shown in the instruction manual to ensure its proper performance and to prevent trouble or injury.

Do not operate the analyzer for a long time with its door left open to avoid entry of dust into the analyzer. Dust deposits will result in damage to the analyzer.

– iii –

Image 4
Contents Infrared GAS Analyzer Introduction RequestProhibition Iii Prohibition Others Contents Vii Specifications OutlineComposition PreparedSelection of installation site InstallationSelection of gas sampling location Installation work Connection of cablesPiping procedure Injection of clean water Supply of external powerDescription of Each Part Preparation for OperationAirtightness test Setting of temperature inside lockerWarm-up time INDICATION/OPERATION Panel SO2Function and indication of indication/operation panel This panel consists of the following functionsAdvice on Operation General operation of indication/operation panelKinds of standard gas CalibrationPreparation of standard gas Pressure regulation for standard gas cylinder Calibration concentration setting except zirconia O2 sensor Func CAL SET ENTCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operating procedure OperationMaintenance Routine maintenance and inspectionConditioner Periodic maintenance and inspection Other maintenance and inspectionCentration is measured in the setting range of 0 to 200ppm or more at 0.5L/minMaintenance of sampling device Gas extractor type ZBAK1Membrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Maintenance of zirconia O2 sensor Others, major component figuresStandard Accessories and Spares Standard accessoriesSpares for 1 year optional Code for preparation of 1-year spares and suppliesProcessing of Heating Pipe Ends OutlineEnd processing method Grid 300mm 40mm Grid area 150 mm Check after piping Clamp supportSpecifications of tube trace Specifications of heating pipeTroubleshooting Troubleshooting of instrumentError codes and remedies Ambient temperature Power supplyPower consumption Mass weightMonth/NO2, 100ppm Standard requirements For sample gasNumber of output points and kinds of outputs Block diagram Moving average outputAutomatic calibration Ordering informationCalibration tolerance Automatic calibration output hold Calibration cycle Once/day variable, up to 7 daysCode Symbols Diaglam Functions of individual components For outdoor installation type For indoor installation typeConnection Diagram Only specified outputs are wiredHead Office Instrumentation Div International Sales Dept