Fuji Labs ZSP instruction manual Head Office Instrumentation Div International Sales Dept

Page 62

Head Office

Gate City Ohsaki, East Tower, 11-2, Osaki 1-chome, Shinagawa-ku, Tokyo 141-0032, Japan http://www.fesys.co.jp/eng

Instrumentation Div.

International Sales Dept.

No.1, Fuji-machi, Hino-city, Tokyo 191-8502, Japan Phone: 81-42-585-6201, 6202 Fax: 81-42-585-6187 http://www.fic-net.jp/eng

Image 62
Contents Infrared GAS Analyzer Introduction RequestProhibition Iii Prohibition Others Contents Vii Composition SpecificationsOutline PreparedSelection of gas sampling location InstallationSelection of installation site Installation work Connection of cablesPiping procedure Description of Each Part Injection of clean waterSupply of external power Preparation for OperationWarm-up time Setting of temperature inside lockerAirtightness test INDICATION/OPERATION Panel SO2Function and indication of indication/operation panel This panel consists of the following functionsAdvice on Operation General operation of indication/operation panelPreparation of standard gas CalibrationKinds of standard gas Pressure regulation for standard gas cylinder Calibration concentration setting except zirconia O2 sensor Func CAL SET ENTCAL Calibration concentration setting zirconia O2 sensor CAL Comp ENT Zero Single-component analyzer Auto calibration Auto CAL Func Auto CAL Func Auto CAL ENT Auto calibration ON/OFF setting Func Hold ENT Operating procedure OperationMaintenance Routine maintenance and inspectionConditioner Centration is measured in the setting range of 0 to Periodic maintenance and inspectionOther maintenance and inspection 200ppm or more at 0.5L/minMaintenance of sampling device Gas extractor type ZBAK1Membrane filter Exploded view of diaphragm type aspirator Structure of electronic dehumidifier Structure of NO2 /NO converter Structure of Permapure dryer Maintenance of zirconia O2 sensor Others, major component figuresStandard Accessories and Spares Standard accessoriesSpares for 1 year optional Code for preparation of 1-year spares and suppliesProcessing of Heating Pipe Ends OutlineEnd processing method Grid 300mm 40mm Grid area 150 mm Check after piping Clamp supportSpecifications of tube trace Specifications of heating pipeTroubleshooting Troubleshooting of instrumentError codes and remedies Power consumption Ambient temperaturePower supply Mass weightNumber of output points and kinds of outputs Standard requirements For sample gasMonth/NO2, 100ppm Block diagram Moving average outputCalibration tolerance Automatic calibration output hold Automatic calibrationOrdering information Calibration cycle Once/day variable, up to 7 daysCode Symbols Diaglam Functions of individual components For outdoor installation type For indoor installation typeConnection Diagram Only specified outputs are wiredHead Office Instrumentation Div International Sales Dept