
Performing Tests
Overview
gy
Zpwpn—
S ?4: | Puyy |
Once you have selected a calibration procedure to run, see the following list to locate the description of that procedure.
•“TX Antenna Port Cable Calibration” on page 84.
•“TX Test Port Cable Calibration” on page 86.
•“TX Test Port Coupling Measurements” on page 88.
•“Insertion Loss Measurement” on page 91.
•“Return Loss Measurement” on page 93.
Once you have selected a support utility procedure to run, see the following list to locate the description of that procedure.
•“Defining a Frequency Plan” on page 43.
•“Printing the FCC Title Page” on page 41.
Performing Tests
Chapter 4 | 63 |