Agilent Technologies E6385A manual Duyu gyw, Gyyw fy hy, Fyy fy, Duuyy F, Gywu /du6Su Y0F

Models: E6385A

1 138
Download 138 pages 40.35 Kb
Page 65
Image 65

Performing Tests

Full Site Test (FCC)

duyu gyw i

[sp qzwwz©tyr “l•lxp—p•” lyo ”“pntqtnl—tzy” l•p ±”po ©spy •±yytyr —st” —p”—2 Zpp Chapter 5, “Reference,” on page 95 for descriptions of the parameters and specifications.

duuyy F

1. Adjust TX Power [0=no 1=on fail 2=always]

3. GN Power Output [0=meas 1=spec 2=blnk]

The TX Coupling factor for the associated antenna(s) listed in the frequency plan must be entered. This is done in parameters 22 through 28.

30. TX Test Port Cable Loss

gywu /du6Su Y0F

This test uses all specifications described in “Specifications (Pass/Fail Limits)” on page 124.

gyyw fy hy

Select and run the Full Site Test (FCC) as follows:

gy 85 Create a frequency plan for the radios to be tested (see “Defining a Frequency Plan” on page 43).

gy 95 From the Lucent AMPS Test Main Menu screen, select the Test Selections field. The Test Software will display the Test Selections Menu screen.

gy :5 Select the Full Site Test (FCC) field.

gy ?5 Connect the Test Set to the Base Station as shown in the on-screen prompts. gy A5 Press the k1 [Proceed] key.

fyy fy

The Test Software will display test results for each radio as it tests. It provides prompts at the top of the display to indicate the measurement or action currently being performed. See Figure 4-4.

66

Chapter 4

O:\Manuals\E6385A_Amps\Book\perftst.fm

Page 65
Image 65
Agilent Technologies E6385A manual Duyu gyw, Gyyw fy hy, Fyy fy, Duuyy F, Gywu /du6Su Y0F