Agilent Technologies E6385A manual Bu-uyuy, Au S, Yydg hyuwyy

Models: E6385A

1 138
Download 138 pages 40.35 Kb
Page 24
Image 24

Installation

Navigating the Test Software

bu–uyuy

Fq—p• —sp [p”— Zzq—©l•p sl” wzlopo0 —sp S±npy— FTWZ [p”—” Tlty Tpy± ”n•ppy ©tww

l““pl• zy —sp [p”— Zp— ot”“wlpp Ltr±•p 617-2

Hzyqtr±•l—tzy z“p•l—tzy”0 —p”— ±—twt—tp”0 lyo —p”—” l•p r•z±“po ty—z ”±m1xpy±”2 [±•y lyo “•p”” —sp vyzm —z lnnp”” —sp op”t•po ”±m1xpy±2

S 94:

Yydg hyuwyy

au S

Test Configuration – Define test information used by all tests; such as identifying the timing reference signal source, measurement port selection, number of averages, Walsh code power units, cable losses, and Base Station TX Test Port coupling factor.

Base Station Configuration – Enter the specific cell site and Base Station information that the Test Software requires to control the Base Station when communicating with the MSC during tests (after configuring the PC and verifying its operation).

Calibration/Utilities – Access procedures used to ensure optimal calibration of the Test Set and test cables.

Test Selections – Access the available tests.

Serial Port Configuration – Access routines used to define the serial port communication settings for interfacing with the PC serial port.

Installation

Chapter 2

25

Page 24
Image 24
Agilent Technologies E6385A manual Bu-uyuy, Au S, Yydg hyuwyy