SwitchBlade x3112 Installation Guide

Selecting a Site for the SwitchBlade x3112

Observe the following requirements before installing your switch in an equipment rack:

ˆEnsure that the rack is safely secured and that it will not tip over. Devices in a rack should be installed starting at the bottom, with the heavier devices near the bottom of the rack.

ˆThe power outlet for the switch should be located near the unit and should be easily accessible.

ˆIf the chassis has a system and PoE power supplies installed, the power sources for multiple supplies of the same type should be on different A/C circuits to protect the unit from a power circuit failure.

ˆUse dedicated power circuits or power conditioners to supply reliable electrical power to the network devices.

ˆThe site should provide easy access to the ports on the front of the chassis so that you can easily connect and disconnect the network cables, as well as view the unit’s LEDs.

ˆAir flow around the unit and through the side and rear vents should be unrestricted.

ˆDo not place objects on top of the switch.

ˆDo not expose the switch to moisture or water.

ˆEnsure that the site is a dust-free environment.