SwitchBlade x3112 Installation Guide

6.With a # 2 Phillips head screw driver, torque both thumbscrews to

.56 Nm (5 lb-in) maximum.

7.Repeat steps 2 to 6, if you have additional AT-SBx31XZ4 XFP Line Cards to install.

The next step in the installation is “Installing an XFP Transceiver” on page 78.

77

Page 77
Image 77
Allied Telesis X3112, AT-SBX31FAN, AT-SBX31GP24, AT-SBX31XZ4, AT-SBX3161, AT-SBX3165 manual SwitchBlade x3112 Installation Guide