Chapter 2: Installation

6.Verify that the power supply POWER LED is green.

If the LED is OFF, refer to Table 10 on page 39 or Table 11 on page 41 for a description of the LED status.

7.Repeat the procedure for all the power supplies in the chassis.

The switch is now powered on and ready for network operations. To start a local management session on the switch, refer to “Starting a Local Management Session” on page 87.