SwitchBlade x3112 Installation Guide

Installing the AT-SBx31XZ4 XFP Line Card

Perform the following procedure to install the AT-SBx31XZ4 Line Card:

Caution

The AT-SBx31XZ4 XFP Line Card contains active electronic devices, which can be damaged by electro-static discharges (ESD). Follow the procedure given in “Protection Against Electrostatic Discharge (ESD)” on page 60 to guard against ESD damage when unpacking and installing this line card.

1.Choose a slot in the chassis for the AT-SBx31XZ4 Line Card. The line card can be installed in slots 0 to 3 or 6 to11.

Note

Chassis slots 4 and 5 are reserved for the AT-SBx31CFC Fabric

Control Card.

2.Remove the line card from the shipping package. If this item is missing or damaged, contact your Allied Telesis sales representative for assistance.

Note

Store the packaging material in a safe location. You may use the original shipping material if you need to return the unit to Allied Telesis.

3.Align the AT-SBx31XZ4 with the internal chassis card guides in the selected slot of the AT-SBx3112 Chassis. Figure 46 on page 73 shows the line card being aligned in slot 4. Figure 49 shows the line card being aligned with slot 7.

 

 

 

RS-232

POWER

 

 

 

 

 

 

 

 

3

 

 

 

 

5

 

 

 

 

7

 

 

 

 

9

 

 

 

 

11

 

 

 

 

ESD

SBx31XZ4

 

 

 

 

 

 

 

 

1831

0

PORT

ACTIVITY

 

 

 

 

 

 

 

10G LINK /

ACT

 

1

 

 

 

XFP

 

 

2

 

XFP

 

 

3

 

 

 

 

XFP

 

 

 

 

XFP

 

75

Page 75
Image 75
Allied Telesis AT-SBX3165, X3112, AT-SBX31FAN, AT-SBX31GP24, AT-SBX31XZ4, AT-SBX3161 Installing the AT-SBx31XZ4 XFP Line Card