Installation Overview

Installation Overview

Table 2-1 describes the steps needed to install the IntraSwitch 5308FL.

The steps that are optional are labeled “optional”; the steps that are required are labeled “required.” The sections that follow explain each step in detail.

To install the IntraSwitch 5308FL:

 

 

Table 2-1 Installation Overview

 

 

 

Step

 

Action

 

 

1 (required)

Open the box and check the contents.

 

 

See “Package Contents” on page 1-8 for a

 

 

complete list of the items included with your

 

 

IntraSwitch 5308FL.

2

(required)

Install the IntraSwitch 5308FL in an equipment

 

 

rack or prepare it for desktop placement.

 

 

See “Rack Mounting/Desktop Placement” on

 

 

page 2-4.

3

(optional)

Install MII module(s), if any.

 

 

See “Installing MII Modules” on page 2-6.

4

(required)

Check the power connection.

 

 

See “Connecting Power” on page 2-8.

5

(required)

Connect the IntraSwitch 5308FL to the network.

 

 

See “Connecting to the Network” on page 2-9.

6

(optional)

Configure the IntraSwitch 5308FL for

 

 

management capabilities.

 

 

See “Setting up for Management” on page 2-12.

 

 

 

Page 2-3

Page 31
Image 31
Asante Technologies 5308F user manual Installation Overview, Step Action