Installation Overview
Installation Overview
Table 
The steps that are optional are labeled “optional”; the steps that are required are labeled “required.” The sections that follow explain each step in detail.
To install the IntraSwitch 5308FL:
  | 
  | Table   | 
  | 
  | 
  | 
Step | 
  | Action | 
  | 
  | |
1 (required)  | Open the box and check the contents.  | |
  | 
  | See “Package Contents” on page   | 
  | 
  | complete list of the items included with your  | 
  | 
  | IntraSwitch 5308FL.  | 
2  | (required)  | Install the IntraSwitch 5308FL in an equipment  | 
  | 
  | rack or prepare it for desktop placement.  | 
  | 
  | See “Rack Mounting/Desktop Placement” on  | 
  | 
  | page   | 
3  | (optional)  | Install MII module(s), if any.  | 
  | 
  | See “Installing MII Modules” on page   | 
4  | (required)  | Check the power connection.  | 
  | 
  | See “Connecting Power” on page   | 
5  | (required)  | Connect the IntraSwitch 5308FL to the network.  | 
  | 
  | See “Connecting to the Network” on page   | 
6  | (optional)  | Configure the IntraSwitch 5308FL for  | 
  | 
  | management capabilities.  | 
  | 
  | See “Setting up for Management” on page   | 
  | 
  | 
  | 
Page