Final Installation Refreshment Center Operators’ Guide
4800006 48 December 2004
Operational Readiness Check
1. Perform test vends on all selections.
2. Do any of the snack or candy products catch on the tray and fail to vend? If not, skip to
step 3. If so, perform the following procedures on the affected areas until all products
vend properly:
a. Install and/or adjust a product spacer (See "Install a Product Spacer" on page 32).
b. Install a product pusher (See "Product Pusher Usage" on page 35).
c. Install and/or remove spiral wall retainers (See "Spiral Wall Retainer Usage" on
page 34).
d. Perform the appropriate spiral anti-hang-up procedure(s).
3. Test the operation of the coin mechanism.
4. Test the operation of the bill validator.
5. Return all test vended products to the trays.
Spiral Indexing Procedure (One Spiral, One Motor)
The spiral indexing procedures involve rotating spirals one position at a time until the
product vends properly.
1. Home all the motors.
2. Remove the effected spiral.
3. Is the coupler in the proper position?
NO - Move the coupler to the position as shown in "Install a Gear" on page 28. Go to
step 4.
YES - Move the coupler to the next clockwise position (if it's on a right-hand motor), or
the next counterclockwise position (if it's on a left-hand motor). Go to step 4.
4. Replace the sp iral.
5. Perform a test vend (see the previous page).
6. Did the product hang up?
NO - You're finished. Continue to test vend the remaining selections until everything
works right.
YES - Go to step 7.
7. Did you previously move the coupler to the next clockwise or counter clockwi se po sition?
NO - Move the coupler to the next clockwise position (if it's on a righ t-hand mo tor), or the
next counterclockwise position (if it's on a left-hand motor). Return to step 6.
YES - Return to step 2 in the operational readiness check and try another procedure.
Do not move the coupler again.