Hardware Installation
of
ATCA-7150 


3.1Overview
This chapter describes:
zUnpacking and inspecting the blade
zEnvironmental and power requirements
zPrecautions during the operation
zChecking the installation environment
zInstalling accessories
zInstallation and removal procedures
zEjector handles
3.2Unpacking and Inspecting the Blade
Damage of Circuits
Chapter:3
Electrostatic discharge and incorrect installation and removal of the blade can damage circuits or shorten their life.
Before touching the blade or electronic components, make sure that you are working in an
Shipment Inspection
To inspect the shipment, perform the following steps.
1.Verify that you have received all items of your shipment: Printed "Getting Started" guide
Any optional items ordered
2.Check for damage and report any damage or differences to the customer service.
69 |