Emerson RTM-ATCA-7150 manual Hardware Installation of ATCA-7150, List of Packing Items

Models: RTM-ATCA-7150 ATCA-7150

1 122
Download 122 pages 23.4 Kb
Page 70
Image 70

Hardware Installation of ATCA-7150

3.Remove the desiccant bag shipped together with the blade and dispose of it according to your country’s legislation.

The blade is thoroughly inspected before shipment. If any damage occurred during transportation or any items are missing, please contact our customer's service immediately.

Unpacking the Blade

To unpack and check the ATCA-7150 suite, proceed as follows:

1.Wear the ESD-preventive wrist strap.

For more details, see Wearing the ESD-Preventive Wrist Strap on page 75.

2.Lay the packing carton according to the arrow direction on the cover.

3.Cut the tape to open the packing carton.

4.According to Table 3-1, check that the components are complete and in good condition, without defects such as oxidation, chemical corrosion, missing component, or transportation damage.

Table 3-1 List of Packing Items

SN

Description

 

 

1

Packing materials, such as packing carton, plastic package, and foam

 

 

2

Documentation bag, containing documents shipped with the product

 

 

3

ATCa-7150, which can be used with an RTM-ATCA-7150

 

 

4

RTM-ATCA-7150, which must be used with an ATCA-7150

 

 

5

Desiccant bag

 

 

zThe actual items in the packing carton are decided by the contract.

zIf you do not order an RTM of the server blade, all functions provided by the RTM are not available.

70

ATCA-7150 and RTM-ATCA-7150 Getting Started (6806800G42B)

Page 70
Image 70
Emerson RTM-ATCA-7150 manual Hardware Installation of ATCA-7150, List of Packing Items