Emerson RTM-ATCA-7150 manual Insertion and Removal of the ATCA-7150, Operation Description

Models: RTM-ATCA-7150 ATCA-7150

1 122
Download 122 pages 23.4 Kb
Page 97
Image 97

Hardware Installation of ATCA-7150

Table 3-7describes the insertion and removal of the ATCA-7150 by using the ejector handles.

Table 3-7 Insertion and Removal of the ATCA-7150

Operation

Description

 

 

Insert the ATCA-7150

The process for inserting the ATCA-7150 is as follows:

 

z When the ejector handles are not closed, the HOTSWAP LED is on

 

and the ATCA-7150 is not powered on.

 

z After the ejector handles are closed, the HOTSWAP LED blinks at the

 

long blink rate and the ATCA-7150 requests for activation.

 

z After activation, the ATCA-7150 is powered on and the HOTSWAP

 

LED is off.

 

 

Remove the ATCA-7150

The process for removing the ATCA-7150 is as follows:

 

z When you open the ejector handles, the HOTSWAP LED blinks at the

 

short blink rate and the ATCA-7150 requests for deactivation.

 

z After deactivation, the ATCA-7150 is ready for power-off.

 

z When the HOTSWAP LED is on, the ATCA-7150 is powered off. At

 

this time, you can remove the ATCA-7150 by holding the ejector

 

handles.

 

 

Power-On and Power-Off

Table 3-8describes the power-on and power-off of the ATCA-7150 by using the ejector handles.

Table 3-8 Power-On and Power-Off of the ATCA-7150

Operation

Description

 

 

Power on theATCA-7150

Whether you close one ejector handle or both ejector handles, the ATCA-

 

7150 can be powered on and work well.

 

 

Power off the ATCA-7150

When both ejector handles are opened, you can power off the ATCA-

 

7150.

 

 

ATCA-7150 and RTM-ATCA-7150 Getting Started (6806800G42B)

97

Page 97
Image 97
Emerson RTM-ATCA-7150 manual Insertion and Removal of the ATCA-7150, Power-On and Power-Off of the ATCA-7150