Emerson Process Management 1500 4.3Configuring the channels, 2 Channel configuration options

Models: 1500

1 146
Download 146 pages 48.94 Kb
Page 27
Image 27
4.3Configuring the channels

Required Transmitter Configuration

4.3Configuring the channels

The six input/output terminals provided on the Model 1500 are organized into three pairs. These pairs are called Channels A, B, and C. The channels should be configured before doing any other I/O configuration.

Table 4-2Channel configuration optionsChannelTerminals CAUTION

Changing the channel configuration without verifying I/O configuration can produce process error.

When the configuration of a channel is changed, the channel’s behavior will be controlled by the I/O configuration that is stored for the new channel type, which may or may not be appropriate for the process. To avoid causing process error:

Configure the channels before configuring the I/O.

When changing channel configuration, be sure that all control loops affected by this channel are under manual control.

Before returning the loop to automatic control, ensure that the channel's I/O is correctly configured for your process. See Sections 4.5, 4.6, and 4.7.

The outputs and variable assignments are controlled by the channel configuration. Table 4-2 shows how each channel may be configured and the power options for each channel.

.

Table 4-2Channel configuration options

Channel

Terminals

Configuration Option

Power

 

 

 

 

A

21 & 22

mA output (not configurable)

Internal (not configurable)

 

 

 

 

B

23 & 24

Discrete output 1 (DO1)

Internal or external(1)

 

 

 

 

C

31 & 32

Discrete output 2 (DO2)

Internal or external(1)

 

 

 

 

 

 

Discrete input (DI)

 

 

 

 

 

(1) If set to external power, you must provide power to the outputs.

To configure the channels, see the menu flowchart in Figure 4-5.

Figure 4-5Configuring the channels

ProLink Menu

Configuration

Channel

Channel B

·Type assignment

·Power type

Channel C

·Type assignment

·Power type

Before You Begin

Using ProLink II

Flowmeter Startup

Required Configuration

Configuration and Use Manual

19

Page 27
Image 27
Emerson Process Management 1500 4.3Configuring the channels, 2 Channel configuration options, 5 Configuring the channels