Switch Manager

Table 33: Faceplate display messages (Continued)

Message

User action

One of the selected ports is currently in use as

Deselect the donor ports, and then retry the

a donor port to allow for extended credits on

operation.

another port. Modifications to donor ports are

 

not permitted.

 

 

 

Port reset failed.

Verify that the user has permissions to modify

or

the configuration on the switch, that the switch

Request to reset to factory defaults has failed.

is reachable in the fabric, and that the fabric is

or

reachable from the user’s workstation, and

Request for switch reset failed.

then retry the configuration change.

 

 

Request for switch reset failed because admin

Verify that another user is not currently

access was not available.

modifying the switch configuration, using

 

either the management application, or a telnet

 

login, or any application, and then retry the

 

operation.

 

 

Reset will complete shortly. There is a brief loss

Wait for the switch to become reachable

of connectivity with switch.

again. This may take up to one minute.

 

 

Resetting the switch will disrupt traffic. Do you

The requested action causes the servers and

wish to continue?

storage systems attached to the fabric to lose

or

communications until the switch reset is

Deactivating the active zone set will disrupt

complete and the fabric has re-initialized. If

traffic. Do you wish to continue?

this is acceptable, continue; otherwise cancel

 

the operation.

 

 

Resetting to factory defaults will disrupt traffic

This action is disruptive to the fabric. Verify

and cause current switch configuration to be

that this is the action that you want to take.

lost.

 

 

 

Showing Last Known State.

The switch state displayed by the application

 

cannot be updated because the switch has

 

become unreachable. Verify that the switch is

 

reachable in the fabric, and that the fabric is

 

reachable from the user’s workstation.

 

 

The file currently exists.

The selected switch archive file already exists.

 

If it is acceptable to overwrite the file, continue.

 

Otherwise, return and select a different

 

archive file.

 

 

The online port loopback test can only be

Select only a single port, and then retry the

performed on a single port at a time. There

operation.

are multiple ports selected. Continue with

 

loopback test on first selected port.

 

 

 

The zoning information you are about to edit

The application has not been able to

is incomplete. If you apply changes you will

completely read the current zoning database

possibly lose zoning information.

from the switch. If the user edits the incomplete

 

database information and applies the

 

changes, any information which has not been

 

read from the switch is lost.

 

If this is acceptable, continue. Otherwise,

 

verify that the switch is reachable in the fabric,

 

and that the fabric is reachable from the user’s

 

workstation then refresh the display and verify

 

that the zoning database has been completely

 

read, and then retry the operation.

 

 

Unable to perform request. Switch is currently

Verify that the switch is reachable in the

unreachable.

fabric, and that the fabric is reachable from

 

the user’s workstation, and then retry the

 

operation.

 

 

HP StorageWorks 2/8q Fibre Channel Switch Management User Guide

103

Page 103
Image 103
HP 2/8q Fibre Channel manual Deselect the donor ports, and then retry