Installing HyperFabric
Installing HyperFabric Adapters
| You are asked if you want to continue. If you reply Yes, client applications |
| are suspended. Replace the adapter according to the procedure described |
| in the “Managing PCI Cards with OLAR” chapter of the Configuring |
|
|
| When an adapter has been replaced, client application activity resumes |
| unless the TCP timers or the application timers have popped. |
|
|
CAUTION | Do not use the clic_start command or the clic_shutdown command, |
| while an installed adapter is suspended. Do not use SAM to start or stop |
| HyperFabric while an installed adapter is suspended. The operation will |
| fail and an error message will be displayed. |
| After a HyperFabric adapter has been replaced, SAM checks the |
| |
| replacement adapter to ensure that it is permitted according to the |
| |
| activates it. If it is not permitted, SAM displays an error message. |
50 | Chapter 3 |