Index
replacing | 106 |
status, checking | 72, 74, 83 |
DPCs |
|
components | 10 |
troubleshooting | 83 |
E |
|
earthquakes |
|
site preparation for | 32 |
tested toleration for seismic | 163 |
EIA rack standards | 31 |
electrical specifications | 167, 172 |
electricity |
|
safety warnings | 144 |
site wiring guidelines | 176 |
electromagnetic |
|
compatibility See EMC |
|
pulse | 176 |
electrostatic |
|
bag, using to store components | 130 |
EMC (EMI) |
|
compliance with requirements | 157 |
standards | 155 |
suppression | 176 |
EMP | 176 |
environmental specifications | 163 |
ESD |
|
preventing damage to components by | 130 |
Ethernet port |
|
description | 16 |
Ethernet port (for Routing Engine management) | |
cable |
|
connection during initial installation | 50 |
replacement instructions | 105 |
specifications | 183 |
ETSI rack standards | 31 |
F |
|
fan tray |
|
description | 24 |
maintaining | 68 |
troubleshooting | 82 |
fan trays |
|
replacing | 92, 194 |
| |
| |
listed | 87 |
fire safety specifications | 130 |
font conventions | xviii |
G |
|
grounding (electrical) specifications |
|
165 | |
165 | |
grounding cables |
|
lug | 165 |
H |
|
hardware components |
|
power requirements | 171 |
returning for repair or replacement | 197 |
179 | |
host subsystem |
|
description | 11 |
LEDs | 19 |
maintaining | 70 |
taking offline | 96 |
87 | |
humidity (relative), acceptable | 163 |
I |
|
immunity standards | 155 |
installation |
|
AC power, connecting | 54 |
DC power, connecting | 56 |
DPC, connecting | 51 |
parts received, verifying | 38 |
preparing to install | 37 |
router | 45, 187 |
unpacking the router | 37 |
installation instructions |
|
alarm relay contact wires |
|
during initial installation | 50 |
for maintenance or replacement | 91 |
tools required | 49 |
cable, auxiliary or console port (for Routing Engine | |
management) |
|
during initial installation | 50 |
for maintenance or replacement | 105 |
tools required | 49 |
cable, Ethernet port (for Routing Engine |
|
management) |
|
during initial installation | 50 |
for maintenance or replacement | 105 |
tools required | 49 |
DC power and grounding cables |
|
tools required | 53 |
instructions |
|
calculation |
|
power requirements | 171 |
cleaning See cleaning instructions |
|
Index ■ 211