Liebert TM-10098 service manual iCOM Controls Training and Service Manual

Models: TM-10098

1 170
Download 170 pages 16.13 Kb
Page 33
Image 33
Humidity Set Point + (1/2 Proportional Band)

iCOM Controls Training and Service Manual

The humidity controller activates the first stage of dehumidification operation when the return air humidity level increases to 50% of the humidity proportional band. The second stage of dehumidification is activated when the return air humidity level increases to 100% of the humidity proportional band.

The humidity controller deactivates the second stage of dehumidification operation when the return air humidity level decreases to 50% of the humidity proportional control band value. The first stage of dehumidification is deactivated when the return air humidity level decreases to the humidity set point of 50% or 0% of the humidity proportional band.

If the compressors have unloading capability (4-stage cooling), then the compressors are activated in the fully loaded condition for each stage of dehumidification.

2 Stage Compressorized Dehumidification – No Dead Band

Humidity Set Point + (1/2 Proportional Band)

Humid Set Point: 50%

 

 

 

 

Proportional Band: 8%

Dehumid

 

Dehumid

 

 

 

 

 

 

 

Stage 1 On

Stage 2 On

50

51

52

53

54

55

Dehumid

 

Dehumid

 

 

 

Stage 1 Off

 

Stage 2 Off

 

 

 

 

 

 

Increasing Humidity

Note: in the above example that the control band begins at the 50% humidity set point and has a length of 4%, which is ½ of the programmed humidity proportional band value.

As the return air humidity level increases, first stage dehumidification operation is activated at 52%RH or 50% of the dehumidification control band. If the return air humidity level continues to increase the second dehumidification stage actives at 54%RH, which 100% of the dehumidification control band.

32

Page 33
Image 33
Liebert TM-10098 service manual iCOM Controls Training and Service Manual, Humidity Set Point + 1/2 Proportional Band